6th and 7th Industrial Automated Control Systems (IACS) and Smart Grids TG meeting

Group: 
Industrial Automated Control Systems and Smart Grids

Tele-conference on 3 June and meeting on 14 June 2013,  JRC Ispra

The Trusted Test Centres for IACS working sub-group of this Thematic Group met with the ENISA study team now assessing the current European testing capabilities of IACS-SCADA systems. The meeting discussed the options for the way forward for this sub-group, as presented in proposals that had previously been prepared by the sub-group team. It was agreed that the next step should build on the work underway by ENISA, and determine the future needs of key stakeholders for IACS Test Centres in the EU.